Staged upgrade of the ECWA Pine Hill Pump Station, utilizing temporary bypass pumping as required to maintain operation of the facility. Existing pumps were removed and replaced with new horizontal centrifugal axial split case pumps and variable frequency drives. All new suction and discharge piping systems were installed, including new exterior concrete meter vault, control valves, and buried piping tie-ins to the existing distribution network. $2.6M project completed in 2017.