Replace four existing pumps with new 600HP horizontal split case centrifugal pumps. Replace all existing valves with new 36” and 48” butterfly valves for isolation of suction and discharge piping. Project required temporary isolation of the pump station from the distribution system via 48” line stops. Construct new building addition with standby generator, fuel system, and electrical room. $9.5M project currently under construction.